SEANERGY OI team conducted the following steps:

  • Pipeline Inspection
  • Cleaning the pipe around the leak
  • Removing the sleeve in place
  • Installation of a repair sleeve
  • Installation of chains connected to the existing  deadmen for preventing  the movements causing the leak
  • Pipe testing after repair


Tools used

  • 3 hookah diving equipments
  • Diving support vessel
  • Hyperbaric chamber




Duration

Multiple interventions between 2011 and 2013


Number of participants

1 shore site manager, 3 class 2 mention A divers


Special requirements

Intervention to be performed quickly to ensure rapid restoration
of the pipeline operation.



Result

Successful result of operation. 1 day schedule for each intervention was met.